Skip Navigation LinksAbbott Laboratories - Pouch Filling Project

Skip to Details

Description:

These works involved the constriction of the new facility within the envelope of the existing warehouse. The structure will consist of two rooms, namely the Bag Dump and Pouch Filling Room. The structure will also cater for an airlock and all associated services required for the process. The scope of work required an airtight bubble to be constructed initially and all works had to be undertaken within that bubble. All materials, equipment and plant had to be cleaned and wrapped before being brought through the plant to the work area.

The scope included:

  • Alterations/Modifications of existing structure at roof levels to form roof opes.
  • Preparation of existing structural steel for new works, including site welding and drilling at variouse heights.
  • Supply, fabricate and erect new structural steel frame.
  • Construction of new rooms to accommodate the Pouch Fill Process. 

Key Facts / Information:

Client Abbott Ireland
Architect McElroy Associates
Civil / Structural Engineers McElroy Associates
M&E Engineer PM Group
Location Cootehill Co. Cavan