New reclaimed ground/loading area/carparkā€ Berth 52 & 53

Collen was appointed main contractor on this project including reclaiming of large areas of ground at berths 52 and 53. The newly reclaimed land created with dredged fine sand. Ground surface graded to required levels. Because of the very large site on which containers were to be stacked, B&I decided that the container handling would be done by large tyre straddle carriers which could go anywhere on the site. The entire site had to be paved with lean mix concrete and surfaced with asphalt, to carry the heavy wheel loads. These areas featured extensive paving, high mast lighting and perimeter fencing.