Skip Navigation LinksNew Passport Office

Skip to Details
Passport office
Passport office passport office waiting room bathroom

Description:

Refurbishment and Fit Out of 4500m2 over 5 floors within an existing concrete frame building. Demolitions and alterations to suit new layouts, Removal of existing tarmac surface and re-installation of same in basement. Installation of mini-piles within existing building for new lift pit. Excavation and installation of new lift pit to basement level. Installation of structural steel to new openings and to existing window openings. Installation of raised access flooring, installation of new stud partitions and MF and suspended ceilings. Installation of External Aluminium doors and frames, Mechanical and Electrical Fit out. Installation of new lift. installation of internal joinery doors and skirting. Fit out to new bathrooms including new cubicles and sanitary-ware and tiling. Installation of new Carpet tiles, vinyl and ceramic floor tiles. Construction of ground floor extension including steel structure, stone cladding, aluminium glazing, insulated roof and roof lights. Removal and installation of existing roofing membrane and installation of new insulated roofing build up. Installation of new fall arrest system to roof.  

Key Facts / Information:

Client OPW
Architect OPW
Civil & Structural Engineer FDA 
Services Engineer  OPW 
Location Mount Street, Dublin 2
Duration 5 Months 
Value €7 Million